PROJECTS: Outstanding projects are shaded
                                                                                                             
ELEMENTARY 

SCHOOLS

PROJECT STATUS COMPLETION
DATE
BACK CREEK ELEMENTARY Blacktop Resurfacing Complete 7/2007
  Walkway Repair and Extension Complete 6/2007
  Installation of  Walking Track Complete 9/2009
  Gym Shades Complete  
  Stage Curtains Complete  
       
BONSACK 

ELEMENTARY

8 Classroom Addition Complete 8/2006
  60' Concrete Sidewalk Complete 2/2007
  Modification of Entrance Receiving bids  
       
BURLINGTON ELEMENTARY Construct a small private area to be used for catherizations Complete 8/2005
  Replace the carpet in rooms 202, 204 and teachers lounge with VCT Complete 10/2005
   Front Office Renovation Complete 8/2007
  Library Carpet Replacement Complete 12/2007
  Security Gate Complete 3/2008
  Digital Sign Complete  
  Addition Addressing Punch List Items.  Storm Water Pond is being completed. 8/2012
  Paving Track In Progress  
  Modification of Entrance Receiving bids  
       
CAVE SPRING ELEMENTARY Enclose the health clinic in the main office area Complete 8/2005
  Public water connection Complete 8/2005
  Renovation Complete  
  Digital Sign Complete.  
       
CLEARBROOK ELEMENTARY Extend bus drop off; provide additional parking near the main entrance Complete 7/2006
  Automatic Door Opener  Complete 2/2007
  Berm Safety Barrier Complete  11/2007
  Fencing Project Complete 9/2008
       
FORT LEWIS ELEMENTARY Repair roof collapse over the kitchen and cafeteria.
Click here for project update page.
Complete TBD
  Parking Lot Modification Complete  
  Modification of Entrance Receiving bids  
       
GLEN COVE 

ELEMENTARY

Rezone Glen Cove Elementary School controls Complete 8/2007
  Sidewalk connecting to playground Complete 2/2007
       
GLENVAR 

ELEMENTARY

Replace the existing VAT flooring with VCT Complete 8/2006
  Classroom Tile Replacement Complete 8/2007
  Playground Fencing Complete  

9/2008

       
GREEN VALLEY ELEMENTARY Renovate library controls and rezone school Complete 8/2007
  Repair the crumbling brick wall on the lower floor across from room 18 Complete 6/2006
  Install perimeter fence Complete 8/2006
  Library Carpet Replacement Complete 12/2007
  Renovation Complete   
       
HERMAN L. HORN ELEMENTARY Interior accessible ramp from the main building to the gym wing Complete 9/2005
  Storage building Complete 9/2005
  Fencing along Gates Lane Complete 8/2007
  Sidewalk Project Complete  
  Walking Track Complete  
  Modification of Entrance Receiving bids  
       
MASONS COVE ELEMENTARY Replace the gym floor Complete 9/2007
  Storage building Complete 12/2007
  Construct new school
Click here for project update page.
Complete  
       
MOUNT PLEASANT ELEMENTARY Replace carpet and VAT throughout with VCT Complete 10/2005
  Construct an improved traffic pattern in front of the school Complete 8/2007
  Hot Water Lines to Restroom Complete 9/2007
  Directional Sign Complete 6/2008
  Renovation Complete   
       
MOUNTAIN VIEW ELEMENTARY Grading of Grounds Complete 4/2008

 

  Storm Drainage  Complete  
  Modification of Entrance Receiving bids  
       
OAK GROVE 

ELEMENTARY

Storage Building Complete 9/2005
  Modification of Entrance Receiving bids  
       
PENN FOREST ELEMENTARY Public Water Connection Complete 8/2005
  Cafeteria Blinds Complete 2/2007
  Door to Asst. Prin. Office Complete 2/2007
  Addition of Stage Divider and Electrical Panel

 Complete

 

 
       
W.E. CUNDIFF ELEMENTARY Parking Lot Pavement  Complete  
  Replacement of Ceiling Tiles Complete 7/2007
  Replacement of Blinds Complete 7/2007
  Installation of Walking Track Complete 12/2007
  Digital Sign Complete 8/2012
       
MIDDLE SCHOOLS PROJECT STATUS COMPLETION
DATE
       
CAVE SPRING MIDDLE  Bogle Field renovations Complete 8/2005
   Bogle Field Synthetic Surface Complete 9/2007
   Bogle Field Fencing Complete 8/2007
   Breezeway Enclosure Complete 8/2007
  Bogle Field Retaining Wall Complete 6/2008
  Bogle Field Visitor Sideline Fencing Complete 8/2008
  Digital Sign Complete  
  Construct new facility
Click here for project page.
Working through Punch Lists. 2012
  Press Box Renovation Change Order -

Awarded

8/2013
       
GLENVAR MIDDLE Provide acoustic panels in the main gym  Complete 9/2006
  Landscaping for Detention Pond Complete 8/2007
  Greenhouse Complete  
       
HIDDEN VALLEY MIDDLE Parking lot access management redesign Complete 9/2006
   New Lockers Complete 8/2007
  Roofing Complete 2/2010
  HVAC Upgrade Complete 2/2010
  Upgrade of Fire Hydrants and Waterline Complete  
       
       
NORTHSIDE MIDDLE Elevator Replacement Complete 12/2005
  Football-Soccer Field Expansion Complete 10/30/06
  HVAC Complete 8/2007
  Walking Track Paving Complete 3/2007
  Backstop Repair Complete 2/2007
  Track Drainage Improvements Complete 9/2007
  Ceiling Tile Abatement Complete 8/2008
  RCCMS Modifications Complete 9/2009
  Gymnasium Air Conditioning Controls need to be programmed.  
       
WILLIAM BYRD MIDDLE Replace the carpet in the main office and guidance area with VCT Complete 10/2005
  Remove the wall between rooms 104 and 106 in Special Ed Complete 8/2005
  Carpet Installation Complete 9/2008
       
HIGH SCHOOLS PROJECT STATUS COMPLETION
DATE
       
ARBTC Manufactured home pavilion Complete 10/2005
  School building materials only Complete 12/2006
  School within a school Complete 12/2006
  Security Fence Complete 1/2007
  Lighting Project Complete 5/2009
  Paving Project Complete 9/2008
       
CAVE SPRING HIGH Rezone classrooms, auditorium, library, admin offices, gym, cafeteria Complete 8/2007
  Library Light Fixture and Ceiling Replacement Complete  7/2007
  Softball and soccer field construction Complete 3/2006
  Soccer concession stand and restrooms Complete 4/2006
  Softball Concessions  Complete  

 

3/2007
  Wall tile replacement in gymnasium Complete 9/2006
  Parking lot resurfacing Complete 8/2006
  Access road to soccer field Complete  7/2006
  Dusk to Dawn Lights & 

Permanent Electric to Scoreboard

Complete 3/2007
  New Roof on Gym Complete  2/2007
  Storage Building Complete 2008
  Erosion Control Modifications Complete 8/2008
  Front Entrance Renovation Complete 5/2009
  Library and Cafeteria Updates Complete 4/2011
  Gymnasium Air Conditioning In Progress  
       
GLENVAR HIGH Install an elevator for accessibility Complete 11/2006
  Paving Complete 8/2007
  Replacement Window Shades Complete 8/2007
  Carpet Removal/Tile Installation in Main Office Complete 8/2007
  Digital Sign  Complete  
  Track Resurfacing Complete  
  Gymnasium Air Conditioning In Progress  
  Renovation RFP for

A & E Services due 4/25/13

 
  Installation of Fencing 

Around Trailers

Materials are on order.  
       
HIDDEN VALLEY HIGH Baseball and soccer concession stands and restrooms Complete 3/2006
  Softball Concessions & Restrooms Complete 11/2006
  Retaining Wall behind concession Complete 4/2007
  Paving at Soccer Field Complete 7/2007
  Well for Irrigation Complete 5/2009
  Soccer, Baseball, Softball Irrigation Systems Complete 5/2009
  Gymnasium Air Conditioning In Progress  
  Modification of Entrance Receiving bids  
       
NORTHSIDE HIGH

Renovations and additions

 

 

Complete

 

6/2009
  Retaining Wall to Correct Erosion at Track Complete 4/2007
  Baseball Safety Net Complete 6/2008
  Track Resurfacing Complete  
  Digital Sign Complete  
  Path Paving Complete  
  Baseball Fencing Complete  
  Modification of Entrance Receiving bids  
       
WILLIAM BYRD HIGH Tennis courts Complete 9/2006
  Retaining wall removal, grading, landscaping Complete 2/2007
  Parking Lot Resurfacing Complete 8/2006
  Parking Lot Lighting Complete  8/2007
  Baseball field perimeter drainage, wall reconstruction, & paving Complete 4/2007
  Protective covering for concrete pad on football field Complete  
  Softball Facilities Complete 10/2008
  Renovations and Additions Complete   
  Track Resurfacing Complete  
  Softball Fencing Complete 2/2011
  Baseball Safety Net/Poles Complete 3/2011
  Renovation Complete   
  Culvert Project Complete  
  Stadium Paving Complete   
  Digital Sign (offsite) Complete  
       
OTHER FACILITIES PROJECT STATUS COMPLETION
DATE
       
BUS PARKING LOTS Install timer for engine block heaters Complete 11/2005
       
ADMINISTRATION File storage system for guidance records Complete 4/2006
  Versa Trans software upgrade Complete 6/2006
  Routers for IP telephone system and distance learning Complete  
  Door Re-keying - Systemwide Complete 6/2007
  IP Telephony Conversion (Administrative Offices, Schools, Transportation, Warehouse, Maintenance) Complete 10/2006
  IP Telephony Conversion (Mobile Classrooms) Complete 2/2007
  New RCPS Warehouse Complete 4/2006
  Installation of security cameras at all schools Complete 8/2007
  Gym HVAC Complete 8/2008
  Walking Track Sealing Complete  
  Installation of School Smoke Detector Systems Complete 8/2010
  Cardless Key Security System - Systemwide PO awarded to 

Simplex Grinnell

 
  Elementary School Gym

Air Conditioners

Installations Ongoing 5/2013

                                                                                                                                                                                        Project list updated 4/17/2013